New storage without flattening insulation
Warranty guidance considered
We plan the installation with relevant NHBC requirements in mind.
Deep insulation protected
The raised floor keeps boards and stored items above the material.
Services stay accessible
We avoid covering tanks, cables and areas that may need future attention.
Storage above modern insulation depths
Modern homes often have deep loft insulation and closely spaced trusses, so fixing boards directly across the joists can cause trouble. The material may be compressed, ventilation can be reduced and the arrangement may not follow relevant warranty guidance. Our new build loft boarding uses a raised system selected around the roof structure and insulation depth. We inspect the trusses, services, water tanks, eaves and current access before defining the safe footprint. This gives your Cardiff home useful storage in a space that may otherwise go untouched, especially where garages and built-in cupboards are limited.


Planned with NHBC guidance in mind
We approach new-build work with relevant NHBC guidelines in mind to help protect the home's NHBC Warranty. The platform sits above the insulation, preserving its effective depth and leaving room for intended airflow. We also plan around services that must remain accessible, rather than boarding every visible area. Closely spaced trusses and low eaves may shape the final footprint, but shelving or a focused central platform can still add valuable capacity. After surveying your Cardiff loft, we specify the proposed system and layout in a tailored quotation, with no deposit required before installation.
Frequently asked questions
Will boarding affect our NHBC Warranty?
Poorly planned work may create concerns, particularly if it compresses insulation or ignores the roof structure. We follow an NHBC-guideline approach and survey the property before proposing a suitable raised system.
Why do new-build lofts need raised boarding?
They commonly contain deep insulation that should not be flattened by boards and stored boxes. A raised system creates a firm surface above the material while allowing for ventilation and structural features.
Can we board the entire new-build loft?
Not every area will necessarily be suitable. We plan around trusses, low eaves, tanks, services and safe access. A well-positioned platform can provide useful capacity without forcing flooring into impractical spaces.
